Minutes of Proceedings of the Institution of Civil Engineers, Band 234Institution of Civil Engineers, 1933 Vols. 39-204 (1874/75-1916/17) have a section 3 containing "Abstracts of papers in foreign transactions and periodicals" (title varies); issued separately, 1919-37, as the institution's Engineering abstracts from the current periodical literature of engineering and applied science, published outside the United Kingdom. |
Im Buch
Ergebnisse 1-3 von 86
Seite 283
... length of 9,752 feet . In 1,830 holes 3,016 tons of cement were injected , representing 1-16 ton per foot length of tunnel . The work which had been carried out proved to be so successful that it was decided to extend operations to ...
... length of 9,752 feet . In 1,830 holes 3,016 tons of cement were injected , representing 1-16 ton per foot length of tunnel . The work which had been carried out proved to be so successful that it was decided to extend operations to ...
Seite 285
... length from 11 miles to 12 miles 5 chains was completed . For the retreatment of the length 11 miles 30 chains to 11 miles 70 chains ( contract No. 1 ) intermediate holes , corresponding to D and E of that contract , were drilled 20 ...
... length from 11 miles to 12 miles 5 chains was completed . For the retreatment of the length 11 miles 30 chains to 11 miles 70 chains ( contract No. 1 ) intermediate holes , corresponding to D and E of that contract , were drilled 20 ...
Seite 299
... length of pipes had had to be renewed , about 10 chains from the pumps , sedimentation having taken place there ... length through which breaks - through had occurred , and that length was a middle length . They had started in the middle ...
... length of pipes had had to be renewed , about 10 chains from the pumps , sedimentation having taken place there ... length through which breaks - through had occurred , and that length was a middle length . They had started in the middle ...
Inhalt
MINUTES OF PROCEEDINGS | 1 |
Transfer of Associate Members to the class of Members | 104 |
Discussion on the two foregoing Papers 3 cuts | 118 |
15 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
Alfred Yarrow angle angle of repose attack Author B.Sc bridge C.E. VOL carried cement central deflection centre of pressure Civil Engineers coat coefficient Committee concrete considerable construction corrosion Council curve cylinders diameter Dugald Clerk effect Egmore electric equation experiments feet film force formula frequency friction gallons given granular material grout hammer-blow horizontal House of Lords impact Inst Institution iron jetty joints length lining load locomotive Lord Lord Macnaghten Madras material maximum metal method miles movement obtained occur oscillation oxide oxygen paint Paper pipe-line pipes placed plane of rupture Plate potassium chromate present pressure tunnel Professor protection purpose Railway retaining-walls rock rust sand scale Severn tunnel shaft society sodium hydroxide span springs square inch steel Steenbras stresses substations surface temperatures tests tons vertical wall wedge theory weight whilst William