Minutes of Proceedings of the Institution of Civil Engineers, Band 234Institution of Civil Engineers, 1933 Vols. 39-204 (1874/75-1916/17) have a section 3 containing "Abstracts of papers in foreign transactions and periodicals" (title varies); issued separately, 1919-37, as the institution's Engineering abstracts from the current periodical literature of engineering and applied science, published outside the United Kingdom. |
Im Buch
Ergebnisse 1-3 von 83
Seite 53
... cost of the tunnel worked out to about £ 24 per linear foot , from the figures given in Table II . That , again , was about double the cost of such a tunnel in this country , and the reason for that appeared to lie chiefly in the ...
... cost of the tunnel worked out to about £ 24 per linear foot , from the figures given in Table II . That , again , was about double the cost of such a tunnel in this country , and the reason for that appeared to lie chiefly in the ...
Seite 64
... costs of the reservoir works and pipe - line construction works amounted to : - Reservoir Works . £ s . d . Estimated cost 260,000 0 0 Actual cost , including temporary dam higher up the valley • 280,055 6 3 Estimated cost Actual cost ...
... costs of the reservoir works and pipe - line construction works amounted to : - Reservoir Works . £ s . d . Estimated cost 260,000 0 0 Actual cost , including temporary dam higher up the valley • 280,055 6 3 Estimated cost Actual cost ...
Seite 248
... cost which the railway has been called upon to contribute is unduly high . This question of interference , and of the consequent heavy cost of alterations to telegraph and telephone lines , is one which should receive the close study of ...
... cost which the railway has been called upon to contribute is unduly high . This question of interference , and of the consequent heavy cost of alterations to telegraph and telephone lines , is one which should receive the close study of ...
Inhalt
MINUTES OF PROCEEDINGS | 1 |
Transfer of Associate Members to the class of Members | 104 |
Discussion on the two foregoing Papers 3 cuts | 118 |
15 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
Alfred Yarrow angle angle of repose attack Author B.Sc bridge C.E. VOL carried cement central deflection centre of pressure Civil Engineers coat coefficient Committee concrete considerable construction corrosion Council curve cylinders diameter Dugald Clerk effect Egmore electric equation experiments feet film force formula frequency friction gallons given granular material grout hammer-blow horizontal House of Lords impact Inst Institution iron jetty joints length lining load locomotive Lord Lord Macnaghten Madras material maximum metal method miles movement obtained occur oscillation oxide oxygen paint Paper pipe-line pipes placed plane of rupture Plate potassium chromate present pressure tunnel Professor protection purpose Railway retaining-walls rock rust sand scale Severn tunnel shaft society sodium hydroxide span springs square inch steel Steenbras stresses substations surface temperatures tests tons vertical wall wedge theory weight whilst William