Minutes of Proceedings of the Institution of Civil Engineers, Band 231Institution of Civil Engineers, 1931 Vols. 39-204 (1874/75-1916/17) have a section 3 containing "Abstracts of papers in foreign transactions and periodicals" (title varies); issued separately, 1919-37, as the institution's Engineering abstracts from the current periodical literature of engineering and applied science, published outside the United Kingdom. |
Im Buch
Ergebnisse 1-3 von 46
Seite 113
... sewers with higher theoretical velocities . All sewers were laid on concrete foundations , and pipes laid at a greater depth than 4 metres were encased in concrete . The general policy has been to sewer only streets where the demand was ...
... sewers with higher theoretical velocities . All sewers were laid on concrete foundations , and pipes laid at a greater depth than 4 metres were encased in concrete . The general policy has been to sewer only streets where the demand was ...
Seite 137
... sewers , but for the sewer where a high velocity was most urgently necessary they had reduced the figure to 3 feet per second . From the figures given in Appendix III , a simple calculation showed that , although 3 feet per second had ...
... sewers , but for the sewer where a high velocity was most urgently necessary they had reduced the figure to 3 feet per second . From the figures given in Appendix III , a simple calculation showed that , although 3 feet per second had ...
Seite 157
... sewers under conditions almost , if not quite , as unfavourable as in Cairo ; and in many cases there had been little , if any , serious deterioration . A notable instance was the main sewer at Dacca running alongside the " khal ...
... sewers under conditions almost , if not quite , as unfavourable as in Cairo ; and in many cases there had been little , if any , serious deterioration . A notable instance was the main sewer at Dacca running alongside the " khal ...
Inhalt
MINUTES OF PROCEEDINGS | 1 |
Correspondence on ditto 1 cut | 29 |
Induction of the PRESIDENT | 31 |
Urheberrecht | |
11 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
adit arc welding arch Author average B.Sc Ben Nevis bend butt welds Cairo carried catchment-area cement cent coefficient of discharge concrete considerable construction cost cubic metres cusecs cutting depth diameter downstream drops drops efficiency ejectors electric electrode engineers excavation experiments factor of safety fault feet per second fillet welds flow gradient head increased Inst Kinlochleven length load loch Laggan loch Linnhe loch Treig Lochaber Lond longitudinal fillets maximum miles obtained Paper pipe-line pipes plate possible power-house pressure priming pumps railway rainfall reservoir river Spey riveted rock scheme Series sewage sewers shaft showed shown in Figs side siphon siphon spillway slip slope specimens spillway square inch square miles steel strength stress structure Stud surface Table tests throat tons per inch tons per square transverse fillets tunnel upstream valves velocity water-level water-power weld metal welded joints welder