Minutes of Proceedings of the Institution of Civil Engineers, Band 161The Institution, 1904 Vols. 39-204 (1874/75-1916/17) have a section 3 containing "Abstracts of papers in foreign transactions and periodicals" (title varies); issued separately, 1919-37, as the institution's Engineering abstracts from the current periodical literature of engineering and applied science, published outside the United Kingdom. |
Im Buch
Ergebnisse 1-3 von 49
Seite 23
... placed . In commercial docks , no other portion of the pontoon - deck requires special stiffening , as the bilge - blocks can be placed directly over the stiff transverse girders ; and if a ship is required to be completely slung by the ...
... placed . In commercial docks , no other portion of the pontoon - deck requires special stiffening , as the bilge - blocks can be placed directly over the stiff transverse girders ; and if a ship is required to be completely slung by the ...
Seite 29
... placed . The Pola Dock , of 15,000 tons capacity , constructed by the Austrian authorities themselves in the arsenal at Pola , lifted its first ship within 23 months of the date when the first drawings were supplied . In commercial ...
... placed . The Pola Dock , of 15,000 tons capacity , constructed by the Austrian authorities themselves in the arsenal at Pola , lifted its first ship within 23 months of the date when the first drawings were supplied . In commercial ...
Seite 108
... placed right down in the bottom of the dock , where it flushed itself . The only developments were that , instead of the old lignum - vitæ bearings , they now used steel ball - bearings , and drove the vertical pump - shaft either by ...
... placed right down in the bottom of the dock , where it flushed itself . The only developments were that , instead of the old lignum - vitæ bearings , they now used steel ball - bearings , and drove the vertical pump - shaft either by ...
Inhalt
Appendixes to ditto | 39 |
Correspondence on ditto 10 cuts | 66 |
Transfer of Associate Members to the class of Members | 114 |
Urheberrecht | |
20 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
actual advantage air-pump Alfreton arch Author bending-moment Bermuda berth boilers booms bottom bricks brickwork bridge built C.E. VOL carried cement cent centimetres centre circulating water condensing-plant connection considerable construction cooling-surface corbels cost curve depth designed draught Elastic modulus electric Engineer excavated experience extrados feet 6 inches floating dock floating docks footbridges girders graving-dock Havana INCHES OF MERCURY increase influence-line Inst keel-blocks length lifted longitudinal Maryland Steel Company maximum metacentric height Moncreiffe tunnel mortar necessary obtained ordinary ordinate P₂ Paper parabola piers Plate pontoon portion Portland cement pound of steam pressure pump Railway ropeway scale self-docking shafts shear shearing-force ship shown in Fig side-walls Sir William White span square foot square inch steam condensed steel stress Stülcken surface surface condenser taken Temp temperature tests tons per foot tons per square tubes uniformly-distributed load vacuum vertical vessel weight width