Industrial SchedulingPrentice-Hall, 1963 - 387 Seiten |
Inhalt
STRUCTURES OF SCHEDULING PROBLEMS | 7 |
NUMERICAL EXPERIENCE WITH THE LINEAR AND MONTE CARLO | 21 |
5 | 44 |
Urheberrecht | |
13 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
A₁ algorithm alternate routing B₁ C₁ Carnegie Institute coefficients column complete Conjecture considered constraints critical jobs critical path critical-path method decision rule dispatching dynamic-priority economic order quantity Equation expected exponentially distributed facility factor Figure finish forecast fractile function Gantt chart given increased integer linear programming integer programming inventory irreflexive job shop labor flexibility labor labor labor learning linear programming load lot-size marginal cost matrix minimize minimum number number obtained operation Operations Research optimal optimum overtime percent performance period planning possible predecessors priority rules probability procedure production queue delay random Research safety stock sample scheduling problem selected sequence set-up shortest shortest-operation rule shortest-processing-time rule simulation slack solution solve Table task tests tion total number total schedule units per hour urgency number utilization variables vector waiting waiting-time distribution X₁ zero